Ningbo SunPu Electronics Co., Ltd.
Structured cabling manufacturer since 2010jack@cat6-cable.com

Buyer comparison center

Compare the construction, not only the category name.

Select up to three SUNPU product directions. Use the result to identify specification gaps before requesting samples or a quotation.

Choose models

Build a working shortlist.

Products from different families can be compared, but a valid substitute must still be reviewed against the same system role, interface, performance target, and environment.

Side-by-side review

1 selected product.

Blank or different fields are review points—not automatic failures. Confirm the exact quoted construction and model-level evidence before approval.

Decision fieldMPO-LC-12MPO–LC 12F Harness CableOpen product page →
System familyHigh-Density Fiber
Product roleFiber / MPO Breakout Harness
Product directionA 12-fiber MPO-to-six-duplex-LC harness for breaking a high-density trunk or parallel interface into familiar LC ports.
Key identifiersMPO–LC · 12 Fiber · Harness
MPO end12-fiber male or female by architecture
Breakout6 × duplex LC
FiberOS2 / OM3 / OM4
PolarityMapped to the system method
LegsCustom stagger, length, and labels
Typical applications
  • 40G-to-10G migration
  • Cassette-free breakouts
  • High-density equipment fan-out
Configuration fields
  • Fiber type and loss grade
  • MPO gender/polish
  • LC leg length and stagger
  • Labels and test report
RFQ inputs
  • Architecture and port map
  • Connector gender/polarity
  • Overall and breakout lengths
  • Required quantity and destination
  • Target standard or project specification
  • Packaging, labels, and document requirements

Use the shortlist

Turn the comparison into a model review.

Send the selected models together with the application, quantity, destination, target standard, required documents, and any reference specification. SUNPU can then confirm which differences matter for the quotation.

01

Same label ≠ same construction

Category names can hide differences in conductor, shielding, connector, jacket, test basis, and packaging.

02

Missing field = question

A field not shown on the website should be confirmed in the quotation or controlled specification, not guessed.

03

System role comes first

Compare products that perform the same job in the channel and verify surrounding-component compatibility.

04

Evidence follows the model

Certificates, declarations, reports, and inspection records must be checked against the selected construction.