Six-stage coordination
Move from an open BOQ to a controlled shipment pack.
Each stage removes a different uncertainty. The commercial offer becomes more useful when assumptions, approvals, and deliverables stay connected to the same model and revision.
01Requirement intake
Record every BOQ line, route, interface, environment, quantity, destination, required date, reference file, and unresolved field.
02System mapping
Connect cables, termination hardware, patching, enclosures, management, labels, spares, and test requirements around the topology.
03Model shortlist
Return a model-level shortlist with configuration fields, compatible components, alternatives, exclusions, and questions that affect price or fit.
04Sample and evidence
Agree which physical samples, drawings, datasheets, model-specific documents, and test records are required before approval.
05Order release
Freeze the accepted construction, quantities, labels, artwork, packaging, inspection points, and change-control basis before production.
06Shipment pack
Keep product identity consistent across unit packs, cartons, packing list, requested inspection records, and handover documents.