Solution / FTTH & PON access networks
An FTTH bill of materials is easier to quote and install when the feeder route, split strategy, distribution points, drop lengths, connector polish, splice plan, port mapping, and optical acceptance record are built as one path.
Planning outcome
A location-based ODN schedule that links every cable section, splice, splitter input and output, adapter, terminal port, drop connection, label, reserve, and test record.
Typical system map
OLT-side interface, feeder fiber count, cable route, ODF position, pigtails, adapters, splices, reserve fibers, and test baseline recorded together.
Centralized or distributed split, splitter ratio and package, input and output polish, cabinet or closure position, port map, and loss allowance defined before ordering.
Distribution cable, closure branch, terminal-box capacity, drop cable type and length, route exposure, spare ports, and subscriber identification coordinated by address or service ID.
Outlet or termination point, SC/APC connection, field or factory termination method, cleaning, inspection, optical test, labels, and exception record tied to the activated line.
Project inputs
Buyer questions
Compare feeder-fiber use, cabinet and closure space, access for maintenance, subscriber density, route lengths, growth areas, failure isolation, and the number of optical interfaces. Record the selected split stage and physical location on the same port map.
List each cable section and length, fiber ID, splice, connector pair, adapter, splitter input and output, expected component loss, engineering reserve, test wavelength, acceptance result, and subscriber destination. Keep design values separate from measured handover results.
No. Record UPC or APC polish at the ODF, splitter, adapter, terminal box, drop, outlet, and equipment port. The mating interfaces must match, and connectors should be cleaned and inspected before optical testing.