Ningbo SunPu Electronics Co., Ltd.
Structured cabling manufacturer since 2010jack@cat6-cable.com

Buyer comparison center

Compare the construction, not only the category name.

Select up to three SUNPU product directions. Use the result to identify specification gaps before requesting samples or a quotation.

Choose models

Build a working shortlist.

Products from different families can be compared, but a valid substitute must still be reviewed against the same system role, interface, performance target, and environment.

Side-by-side review

1 selected product.

Blank or different fields are review points—not automatic failures. Confirm the exact quoted construction and model-level evidence before approval.

Decision fieldSMB-1-2Single / Dual-Port Surface-Mount BoxOpen product page →
System familyCopper Connectivity
Product roleConnectivity / Surface Outlet
Product directionA compact work-area housing for one or two keystone modules where flush mounting is unavailable or unnecessary.
Key identifiers1/2 Port · Surface Mount · Keystone
CapacityOne or two keystone modules
MountingAdhesive or screw fixing by model
Cable entryRear and side entry options
LabelingPort ID area by housing
ColorWhite standard direction; other colors by review
Typical applications
  • Small offices
  • Retail counters
  • Retrofit network outlets
Configuration fields
  • Single or dual port
  • Shutter and label style
  • Housing color
  • Screw, adhesive, and packaging set
RFQ inputs
  • Single or dual port
  • Shutter and label style
  • Housing color
  • Required quantity and destination
  • Target standard or project specification
  • Packaging, labels, and document requirements

Use the shortlist

Turn the comparison into a model review.

Send the selected models together with the application, quantity, destination, target standard, required documents, and any reference specification. SUNPU can then confirm which differences matter for the quotation.

01

Same label ≠ same construction

Category names can hide differences in conductor, shielding, connector, jacket, test basis, and packaging.

02

Missing field = question

A field not shown on the website should be confirmed in the quotation or controlled specification, not guessed.

03

System role comes first

Compare products that perform the same job in the channel and verify surrounding-component compatibility.

04

Evidence follows the model

Certificates, declarations, reports, and inspection records must be checked against the selected construction.